• Heat
  • Floor
Download PDF

reference

Renovation of the Hollweger Mill in 26655 Westerstede

Gurcke windmill IDEAL CLASSIC NEO 20

The mill was extensively renovated and converted into a modern residence. Since the owner placed great importance on sustainability and energy-efficient solutions, a heat pump with the IDEAL CLASSIC NEO 20 installed. A 25 kWp photovoltaic system on the roof of the outbuilding further contributes to the high degree of self-sufficiency.

  • Flooring tile
  • Underfloor heating system IDEAL CLASSIC NEO 20
  • Size 216 m²
  • Area Seven Floors
Gurcke windmill IDEAL CLASSIC NEO 20

construction

  1. Carpet / Tiles / Parquet / Laminate / Designer flooring
  2. Dry screed element (Fermacell) 20 mm
  3. IDEAL CLASSIC NEO 20 + system pipe (16 mm) 20 mm
  4. Frame timber (20 mm)
  5. EPS edge insulation strip | NEO
  6. Possibly a moisture barrier
  7. 40 mm
System IDEAL CLASSIC NEO 20

Further references

Discover the diverse application possibilities of mfh systems products and take a look at other exciting references!

mfh_referenz_CF_PRO 12_hasloewer_DE_072015
Renovation of an apartment in 49124 Georgsmarienhütte
mfh_referenz_classic_eps_fbh_restaurant_huegoloss_072019_DE
Restaurant extension with a conservatory in 45133 Essen
mfh_report_ceiling_basic_piephans
Conversion and extension of a detached house in 49078 Osnabrück