• Heat
  • Wall
Download PDF

reference

Renovation of an office in 49191 Belm-Vehrte

In an office building in Vehrte, an existing office was renovated, simultaneously increasing the self-consumption of the existing photovoltaic system. A total of eight 2-meter-long heating foils were installed in the walls of a 21 m² room. The E-NERGY CARBON FLEECE system was used.

  • Wall covering fine filler
  • E-NERGY CARBON FLEECE panel heating
  • Size 21 m²
  • Ground floor area

construction

  1. Tiles ≥ 10 mm | Natural stone ≥ 15 mm
  2. If necessary, sealing in damp rooms
  3. Tile adhesive approx. 2 mm per layer, 4 mm
  4. E-NERGY CARBON FLEECE 0.4 mm
  5. primer
  6. 5 mm
E-ENERGY CARBON FLEECE system

Further references

Discover the diverse application possibilities of mfh systems products and take a look at other exciting references!

mfh_referenz_e-nergy_carbon_fleece_boden_bv mayer
New construction of a bungalow in 96152 Burghaslach
Renovation of St. Martin's Church, in 4042 Trstenik, Slovenia
mfh_referenz_e-nergy_carbon_fleece_wand_tinyhouse_koye
Prototype of a tiny house in 95694 Mehmeisel