reference
Renovation of an office in 49191 Belm-Vehrte

In an office building in Vehrte, an existing office was renovated, simultaneously increasing the self-consumption of the existing photovoltaic system. A total of eight 2-meter-long heating foils were installed in the walls of a 21 m² room. The E-NERGY CARBON FLEECE system was used.
- Wall covering fine filler
- E-NERGY CARBON FLEECE panel heating
- Size 21 m²
- Ground floor area

construction
- Tiles ≥ 10 mm | Natural stone ≥ 15 mm
- If necessary, sealing in damp rooms
- Tile adhesive approx. 2 mm per layer, 4 mm
- E-NERGY CARBON FLEECE 0.4 mm
- primer
- 5 mm