Download PDF

reference

Renovation of an office in 49191 Belm-Vehrte

In an office building in Vehrte, an existing
office was renovated, simultaneously increasing the self-consumption rate of the existing photovoltaic system.
A total of approximately 10 m²
of heating foil was installed in the ceiling of a 21 m² room, corresponding to a

E-NERGY CARBON FLEECE system was used

  • Ceiling plaster, fine filler
  • E-NERGY CARBON FLEECE panel heating
  • Size 21 m²
  • Ground floor area

construction

  1. Ceiling covering
  2. 2 mm filler
  3. E-NERGY CARBON FLEECE 0.4 mm
  4. Filler / adhesive 2 mm
  5. primer
  6. 5 mm
E-ENERGY CARBON FLEECE system

Further references

Discover the diverse application possibilities of mfh systems products and take a look at other exciting references!

Renovation of an abbey in Großlittigen
Reconstruction of the old parsonage in 27327 Martfeld
mfh_referenz_e-nergy_carbon_fleece_wand_Zweibrücker_Schlösschen_KK
Renovation of the Zweibrücken Castle in 55571 Odernheim am Glan